Published: Monday, February 25, 2008
Page 2 of 3
By: NIO architecten

Interior view.
Words from the architect
Ever since the delivery of the waste processing installation in 1997, the building has not changed. But after the organizations aviTwente and RegioTwente (environmental sector) merged in 2000, there was an immediate need to double the office floor area. This extension also offered the possibility to find a solution for the wish to connect the office building with the main building and the installation, and thus to even out the psychological barrier between white collars and blue shirts.

Exterior view.
In order to make a clear distinction between the big waste processing installation and the extension; the relatively small extension is chosen for a different design and use of material. Compared to the expressive main building, the design of the new office building is quite flat and two-dimensional. The point of departure even being a line: the corridors on which office spaces border alternately left and right. This line starts on top of the existing office building, descends to first floor level then to rise again and to connect to the 7.2 meter level of the waste processing installation. This is the level on which all machines are installed and where the central control room is.
View full page Pages: Previous Page 1 | 2 | 3 Next Page
Architecture-Page is an online design resource, featuring architecture and product design from the world over. More
FAQ | Gallery | Archive | Feeds | Share | A to Z | Products | Publications | Browse Architecture-Page by category | Architecture Firms
Architecture-Page is available in ten languages
English |
Spanish |
Chinese |
Russian |
French |
Japanese |
Korean |
Italian |
German |
Dutch
©2007 Architecture-Page. All rights reserved.
About |
Contact |
Website Usage Terms |
Privacy Policy
Architecture-Page, Architecture-Monitor brought to you by Page Productions
Coming Soon: EraCasa